Top 10 Best Dog Long Lead
of November 2024
1
Best Choice
Leash Boss
Leash Boss
Leashboss Extra Long Dog Leash - Long Lead Leash for Dog Training - Recall Leash for Dogs Outside 30 Foot
10
Exceptional
View on Amazon
2
Best Value
Mighty Paw
Mighty Paw
Mighty Paw Heavy Duty Dog Tie Out Cable - Come In 2 Thicknesses - Perfect For Large & Small Dog - Provides Off-Leash Feel With Total Control - Strong Braided Steel Cable For Durability - Weather Proof
9.9
Exceptional
View on Amazon
3
Mighty Paw
Mighty Paw
Mighty Paw Check Cord - Off-Leash Feel with Total Control - Climbers Rope for Durability & Strength - Light Enough to Float - Perfect for Water Adventure - Safety Reflective Thread - Night Visibility
9.8
Exceptional
View on Amazon
4
Mighty Paw
Mighty Paw
Mighty Paw Dog Leash for Off-Leash Recall Training - Includes Buckled Padded Handle - Suitable for Yard and Camping Activities - Long Dog Lead - Premium Quality Nylon Dog Leash (15 Feet, Black)
9.7
Exceptional
View on Amazon
5
Joytale
Joytale
Joytale Long Dog Training Leash, 30 FT Tie Out Rope Check Cord Dogs Leashes with Padded Handle, Reflective Recall Lead for Puppy and Small Dogs, Black
9.6
Exceptional
View on Amazon
6
Joytale
Joytale
Joytale Long Leash for Dogs, Training Leash with Removable Padded Handle, Double Hook, 15FT/30FT/50FT/65FT Dog Obedience Recall Training Agility Lead for Play, Camping, Backyard Tie Out, Orange, 15FT
9.5
Excellent
View on Amazon
7
CANDYDOG
CANDYDOG
CANDYDOG Long Dog Leash for Dog Training 30FT, Reflective Heavy Duty Dog Lead Rope with Soft Padded Handle, Suitable for Small to Large Dogs, Bright Orange - Classic Leashes and Training Leashes
9.4
Excellent
View on Amazon
8
ROYAL PAW
ROYAL PAW
ROYAL PAW Dog Tie Out Cable - Tie Out Cable for Dogs (up to 300 lbs) - Use Dog Tie-Outs & Stakes for Outside - Best Heavy Duty Dog Leash for Large Dogs (10ft - Black Onyx)
9.3
Excellent
View on Amazon
9
Petest
Petest
Petest 30ft Reflective Tie-Out Cable for Heavy Dogs Up to 125 Pounds
9.2
Excellent
View on Amazon
10
Hi Kiss
Hi Kiss
Hi Kiss Dog/Puppy Obedience Recall Training Agility Lead - 15ft 20ft 30ft 50ft 100ft Training Leash - Great for Training, Play, Camping, or Backyard - Black 30ft
9.1
Excellent
View on Amazon
11
Mycicy
Mycicy
Mycicy Long Rope Leash for Dog Training 12, 15, 22, 30, 36, 50, 60, 80, 100ft Check Cord Recall Training Agility Lead for Large Medium Small Dogs, Great for Training, Playing, Camping, or Backyard
9.0
Excellent
View on Amazon
12
Lynxking
Lynxking
lynxking Check Cord Dog Leash Long Lead Training Tracking Line Comfortable Handle Heavy Duty Puppy Rope 10ft 15ft 30ft 50ft for Small Medium Large Dog
8.9
Very Good
View on Amazon
13
Lanwandeng
Lanwandeng
Long Dog Rope Leash for Dog Training 16FT/30FT/50FT, Reflective Threads Check Cord Recall Training Agility Lead , Heavy Duty Dog Lead for Large Medium Small Dogs Playing, Camping, or Backyard
8.8
Very Good
View on Amazon
14
Segzwlor
Segzwlor
Segzwlor Long Dog Leash - 30ft, 50ft Reflective Training Heavy Duty Rope Dog Leash - Nylon Dog Lead Check Cord for Walking, Hunting, Camping, Running, etc. Easy Control for Small, Medium, Large Dogs
8.7
Very Good
View on Amazon
15
MANDAO
MANDAO
Nylon Training Dog Leash for Small Medium Large Dogs, 15ft 20ft 30ft 50ft Long Leash Dog/Puppy Lead for Obedience Recall Training, Camping (20ft, Black)
8.6
Very Good
View on Amazon
16
Vivifying
Vivifying
Vivifying Dog Training Leash, 32FT Durable Nylon Long Lead with Drawstring Bag for Training Small, Medium and Large Dogs (Orange+Black)
8.5
Good
View on Amazon
17
BTINESFUL
BTINESFUL
BTINESFUL Tie-Out Check Cord Long Rope Dog Leash, 8ft 12ft 20ft 30ft 50ft Recall Training Lead Leash- Great for Large Medium Small Dogs Training, Playing, Camping, or Backyard (20ft, Blue Black)
8.4
Good
View on Amazon
18
XiaZ
XiaZ
XiaZ 50 ft Dog Tie Out Run Trolley Cable, Pet Heavy Duty Reflective Dog Leash Lead Runner for Large Dogs Up to 250 Pound
8.3
Good
View on Amazon
About Dog Long Lead
Click here to learn more about these products.
Leashboss Extra Long Dog Leash - Long Lead Leash for Dog Training - Recall Leash for Dogs Outside 30 Foot
ULTRA DURABLE TRAINING LEAD This long leash for dog training is made from strong, durable nylon that is softer and stronger than cotton leashes. Perfect for training, outdoor activities, and even the beach. COMFORT AND EASE Unlike polypropylene leashes, our long leash for dogs outside doesn't have sharp edges that could scrape your hands while reeling in. All stitching is reinforced and the nickel plated clip swivels to resist twisting or tangling.. CHOOSE YOUR HANDLE Our extra long dog leash is available with a sturdy foam handle for ultimate comfort, a rubber molded handle for a strong grip with dogs that pull, or a standard nylon handle for lightweight on-the-go travel.. VERSATILE USE A great training leash for large dogs or medium dogs for off-leash dog training or training in the backyard. As well as for hiking, camping, training, hunting, recall training, outdoor play with tennis balls, and swimming. GREAT FOR ANY BREED Whether you need a puppy training leash for small dogs or more control over a medium or large dog, our leads are perfect for any pup. Available in lengths between 15 and 100 ft, simply clip to their Leashboss collar or harness.
Mighty Paw Heavy Duty Dog Tie Out Cable - Come In 2 Thicknesses - Perfect For Large & Small Dog - Provides Off-Leash Feel With Total Control - Strong Braided Steel Cable For Durability - Weather Proof
Big Dog Tie Out Cable The Mighty Paw's 30-foot long leash, perfect as a tie out cable for dogs big and small, gives your furry friend extra freedom in the yard, during camping trips or outdoor adventures. It's an ideal tie out leash for dogs of all sizes. Chew Proof and Built to Last Crafted with a steel braided dog chew cable, our chew proof lead is tough enough to withstand even the heaviest chewers and teething pups. This chew proof tie out cable ensures your dog remains safe and secure, making it the perfect chew proof dog lead. Weather and Rust Resistant Our cable tie out is made from weather-resistant, vinyl-coated, braided steel cable, and all-metal hardware. This braided dog cable is built for strength and durability, making it the ideal dog chain for yard use, camping dog leash, and more. Highly Visible Reflective Coating Our braided dog cable features a reflective vinyl coating for enhanced visibility in low light conditions. Your pup's safety is our top priority, so we' ve made sure our cable lead dog is easy to spot. Freedom for Your Dog, Control for You Our cable leads yard are perfect for off leash or recall training. The 30length provides your dog with a sense of freedom and an off-leash feel, while you maintain complete control - the perfect balance for any camping dog tie out.
Mighty Paw Check Cord - Off-Leash Feel with Total Control - Climbers Rope for Durability & Strength - Light Enough to Float - Perfect for Water Adventure - Safety Reflective Thread - Night Visibility
The Mighty Paw 30 ft. Check Cord is the perfect tool for off-leash training, field training, agility, hunting and more. Our check cord allows you to gradually work more space between you and your pup while maintaining control. Dual purpose design comes without a handle, but easily tie one on for added support. Our check cord is made using super light-weight inch rock climbers rope that is both durable and weather-resistant. The clip is a strong, metal hardware that wont break. Its designed to be tangle-free and wont get caught on underbrush.. The bright orange color of the rope is visible in the water or the grass and underbrush. Weve added reflective stitching for ultimate visibility after dark or in low-light.. This check cord is perfect for your pup to swim and play in the water. The rope floats when submerged so your dog can have a blast in the water while you still have control.. Mighty Paw is a Family Owned business operating out of Rochester, NY. Were proud dog owners who build dog products and our dogs always come first in the design process.
Mighty Paw Dog Leash for Off-Leash Recall Training - Includes Buckled Padded Handle - Suitable for Yard and Camping Activities - Long Dog Lead - Premium Quality Nylon Dog Leash (15 Feet, Black)
Why opt for a long leash Highly recommended by thousands of trainers, our dog long line leash brings an authentic off-leash sensation vital for dog off leash training, recall, and behavior modification. Often referred to as a long-line or check cord, it makes an ideal dog leadline for camping dog tie out situations. Perfect for Training Our leash, with a handle that flaunts a buckle, opens up to let the dog leash wrap around trees, posts or tables. It gives your dog a natural off-leash feel and is perfect for dog leash recall training, providing a great dog lead camping solution. Built for Comfort Our dog leash handle is padded with neoprene, ensuring a comfy, non-slip grip. The swivel-free clasp prevents tangling, making the walk or training session a breeze for your active dog and doubling as a reliable dog leash cable. Weatherproof and Durable Crafted with superior quality nylon, the dog long training lead is tough, built to withstand the elements. It's the perfect camping leash for your outdoorsy dog out adventures. Born in the United States Mighty Paw is a family-run venture, operating out of Rochester, NY. We test and design our products on Barley, our co-owner's dog paw approved pupper.
Joytale Long Dog Training Leash, 30 FT Tie Out Rope Check Cord Dogs Leashes with Padded Handle, Reflective Recall Lead for Puppy and Small Dogs, Black
Size For Choice This dog training rope by Width 14 inch with Length 15 ft 30 ft 50 ft. Perfect long training line to get better control of your dogs and give your dog enough freedom while training. Reflective Stitching With night reflective threads design around the training leash, which shows good visibility in low light or in the dark when light hits it, making your furry friends safe when playing at night. 360 Swivel Hook Our training lead comes with 2 Swivel clips, allowing your dog to walk or run in any direction within a controllable distance without getting tangled, great for matching the Joytale's collars and harnesses. Padded Handle Added comfortable padded handle, it will protect your hands from being burnt when holding it if your dog pulls. The training line can be used for hiking, swimming, camping, hunting, backyard, beach, outdoor play, obedience recall training, and more. Nylon Material Made of high-quality nylon material that features lightweight and wear-resistant. The tight stitching of the rope provides meticulous protection for your puppies, also better for long-term use in various conditions, such as rainy, muddy, or snowing.
Joytale Long Leash for Dogs, Training Leash with Removable Padded Handle, Double Hook, 15FT/30FT/50FT/65FT Dog Obedience Recall Training Agility Lead for Play, Camping, Backyard Tie Out, Orange, 15FT
PADDED HANDLE - The grip of this long line dog leash is neoprene padded which is soft and it can get your hand away from burning while training or playing. SEPARABLE DESIGN FOR MUTIL PURPOSE - With handle, this leash is an ideal dog training leash To remove the handle it is a good tie out cable for camping or backyard as a dog tether. HEAVY DUTY CLIPS - Both the hooks of the long lead leash for dog training is made of alloy steel and its rust resistant and durable. PREMUIM CLIMBING ROPE - This long leash for dog training is created by sturdy climbing rope. This material is strong and abrasion resistant, making it an excellent material for training leash for dogs that pull. NO TANGLE - Both of the snap of this extra long leash for dogs outside is swivel-style, which is twisted resistant.
CANDYDOG Long Dog Leash for Dog Training 30FT, Reflective Heavy Duty Dog Lead Rope with Soft Padded Handle, Suitable for Small to Large Dogs, Bright Orange - Classic Leashes and Training Leashes
THE LENGTH A 38 inch diameter, 30ft long dog leash is not only suitable for daily walks but also for outdoor training, tracking, and adventure activities. This makes your dog's life more interesting and colorful, allowing them to enjoy more freedom and comfort, but not so long that it becomes difficult to control. THE STRENGTH Our long leash for dogs is strong enough to withstand the force of your dog pulling, jumping, or running after something. This is because the long dog leash is made of extremely durable, wear-resistant nylon. The rope joint is machine-sewn and strong and robust. THE HANDLE AND METAL HOOK This long dog leash with a foam handle and 360 metal hook is a practical and reliable tool for dog owners. It provides a comfortable grip, high load capacity, and easy direction control. The 360 swivel metal hook prevents knots and tangles. It is a perfect choice for walking out your pet.. SAFETY The bright orange color and reflective function of our long dog leash make it a standout safety feature. Not only does it increase visibility in low-light conditions, but it also helps you keep a close eye on your furry friend to prevent accidents. Whether you're going for a walk at night, running in the early morning, or enjoying an outdoor adventure, this heavy-duty dog leash will keep you and your dog safe and visible.. PRACTICALITY This long dog leash is perfect for outdoor activities. The 30-foot length and high-strength nylon material allow your dog to run and play freely. Plus, a convenient packing bag for storing snacks or picking up trash, its lightweight design and convenient storage method allow you to take it with you everywhere. It is the ideal companion for enjoying outdoor activities with your pet..
ROYAL PAW Dog Tie Out Cable - Tie Out Cable for Dogs (up to 300 lbs) - Use Dog Tie-Outs & Stakes for Outside - Best Heavy Duty Dog Leash for Large Dogs (10ft - Black Onyx)
THE KING OF DOG CABLES Each Royal Paw Dog Tie Out is 6mm thick and equipped with anti-tangle swivels, metal reinforcements, and a robust outer coating. No detail is overlooked - We go above and beyond for you and your dog's sake.. ULTIMATE RUST PROTECTION Our Dog Cable is the only Dog Leash in the market made of 316 Marine-Grade Stainless Steel. It's stronger, more durable and won't rust in direct exposure to water. You'll never have to buy another dog tether again. USEFUL DOG ACCESSORIES INCLUDED Each Dog Cable comes with our exclusive CableMate 3-in-1 Accessory. This handy tool transforms into your Carrier, Storage, and Dog Leash handle All-in-one No need to bring an extra leash, dog chain, or dog runner. Royal Paw can do it all. VERSATILE DEPENDABLE Pair this Heavy Duty Dog Tie Out with our Royal Paw Heavy Duty Dog Stake for the ultimate on-the-go setup. Ideal for the beach, park, camping, dog training, puppy dates, BBQs, and sports events. It's even a great alternative Dog Fence for the Yard. PATENT PENDING DESIGNED IN THE USA Our Tie Out Cable for Dogs Accessories are built to last and is backed with a Lifetime Warranty upon registration. Our experts are on standby and will reply in 12 hours or less. We appreciate your consideration and hope we earn your trust and support. A PERFECT GIFT What's better than a gift of safety and peace of mind Our Dog Cables come in a sleek packaging that's sure to impress your family and friends. No need to search endlessly for your next gift, any dog and dog owner will love this.
Petest 30ft Reflective Tie-Out Cable for Heavy Dogs Up to 125 Pounds
30 ft, ultra strong tie-out cable for dogs up to 125 lbs.. Steel cable and swivel clips for superior strength and durability.. Snaps, which is durable and anti-rust, on both ends can be easily attached to a post or stake for a protection of dog's neck.. Reflective anti-rusty vinyl covers for extra safety at night. Structure feature crimp covers to protect cable ends from weakening due to rain and rust..
Hi Kiss Dog/Puppy Obedience Recall Training Agility Lead - 15ft 20ft 30ft 50ft 100ft Training Leash - Great for Training, Play, Camping, or Backyard - Black 30ft
DIMENSIONS - This dog leash measures 34in wide by 30 feet long. Great for hiking, camping, training, hunting, backyard, beach, recall training, outdoor play with tennis balls, and swimming. LONG LEASH This training leash is great for teaching your dog recalls. It has the length needed to allow them to wander and ensure your command to come is obeyed.. NYLON TRAINING LEAD - This durable, long, nylon dog training leash will outlast cotton leashes. All stitching is reinforced and the nickel plated clip swivels to resist twisting. Our long dog leash is great for medium and large dogs. You'll love using it as a backyard dog leash, for off leash dog training, and more.. Allows you to teach your dog recalls and other obedience skills.. Swivel-style bolt snap resists twisting.
Mycicy Long Rope Leash for Dog Training 12, 15, 22, 30, 36, 50, 60, 80, 100ft Check Cord Recall Training Agility Lead for Large Medium Small Dogs, Great for Training, Playing, Camping, or Backyard
SIZE This nylon woven rope dog leash 12suitable for medium and large dogs and 13suitable for small and small strong pets in diam by 1215223036506080100 feet long,a proper length which provides puppies and medium large dogs a wider range.. HEAVY DUTY TRAINING ROPEIt is made of extra durable wear-resistant nylon which is environmentally friendly material.. METAL HOOKFadeless and rustless plated metal hook, 360 rotation and its easy to open and close.. FORM MEMORIESIt trains the pet to get used to the farthest distance from you, so when you move, memories will help it keep up to a certain distance.. Long leash allows dog for more wandering area and freedom, great choice for dog training,strolling, walking, playing, teaching.We always stand behind all our pet supplies. Any problems, don't hesitate to contact with us..
lynxking Check Cord Dog Leash Long Lead Training Tracking Line Comfortable Handle Heavy Duty Puppy Rope 10ft 15ft 30ft 50ft for Small Medium Large Dog
SUITABLE THICKNESS CHECK CORD To find a balance between weight and strength. 38 is a suitable thickness for long training dog leash, it has both strength and portability. NO TANGLE LONG ROPE LEASH the round climbing rope and 360 degree rotating clasp design long training leash will not tangle whether it is in use or when you roll it up, great for hiking, camping, training, hunting, backyard, beach, recall training, outdoor play with tennis balls, and swimming. LIGHTWEIGHT AND NOT ABSORB WATER soft and lightweight Non-absorbent material won't get more and more heavy in the water and wont sink, it will float when submerged and highly visible against any background.. SOFT AND DURABLE DOUBLE LAYER WOVEN HANDLE check cord has a comfortable woven double layer handle, the joint of the rope is sewn by the machine and is very strong.. SIZE 38 9.5 mm in diam ,Size of this one is 30foot,color orange, by 10 foot 15 foot, 30 foot and 50 foot three length for different training purpose.
Long Dog Rope Leash for Dog Training 16FT/30FT/50FT, Reflective Threads Check Cord Recall Training Agility Lead , Heavy Duty Dog Lead for Large Medium Small Dogs Playing, Camping, or Backyard
Perfect SizeThis long rope leash is 30 feet long and 38 inch in diam, it allows dog for more wandering area and freedom, what's more it is just enough to track the pet's movements within the line of sight and prevent pets from getting lost.. 2 Steel Swivel Hooks DesignBoth ends of the leash have a heavy duty stainless steel swivel hook that can rotate 360 degree. You can tie one end of this training leash to your body or trees,so that you can free your hands when traning, hiking,walking,etc.. Reflective for Night Safety Weve added a reflective stitching around the obedience recall training lead to make sure it is visible in low light. Your pups safety is always our highest priority.. Durable and Lightweight This training Lead is made of high density nylon rope nylon which is lightweight and environmentally friendly, not easy to pull off, and has strength, will not be entangled with trees, grass, etc.. Excellent Outdoor Dog Training Leashs This training dog leash is a great choice for small medium and large breed dogs hiking camping and walking. Any problems, don't hesitate to contact with us..
Segzwlor Long Dog Leash - 30ft, 50ft Reflective Training Heavy Duty Rope Dog Leash - Nylon Dog Lead Check Cord for Walking, Hunting, Camping, Running, etc. Easy Control for Small, Medium, Large Dogs
Occasion Use heavy nylon dog leash is very strong and durable, suitable for small, medium and large dogs. The dog leash length of 50ft and 30ft meets the use of different scenarios. Perfect for training, touring games, chasing games, playing in the courtyard, daily walks, outing camping, swimming, hunting, beach playing and other activities.. Nylon Dog Rope Leash This dog leash diameter 25 is woven from soft nylon material, adopts a special process which is tightly woven, not easy to pull off, and has strength, will not be entangled with trees, grass, etc.. In addition, after many tests, this long dog leash is lightweight enough to float on the water without sinking. Pets can swim on a leash without affecting their activities.. Reflective Dog Leash two reflective lines are added to each dog leash, which can reflect bright light in low light or dim environments. Works well even at night, allowing you to quickly track the movements of your dog,and control your dog well to avoid losing them.In addition, the original color of the leash is also bright enough to be found in most places.In addition, the original color of the leash is also bright enough to be found in most places during the day.. Heavy Duty Swivel Hook Both ends of the leash have a stainless steel swivel hook that can rotate 360, which is strong and durable. Realize that pets can play more freely without worrying about leash entanglement and knotting. When you are tired of playing with pets, you can tie one end of the rope leash to the stakes or trees, so that you can not only free your hands but also pay attention to the pet's movement and ensure the safety of the pet.. The perfect working training rope leash is the ideal rope suitable for field training, agility, hunting, etc. The dog leash has a soft handle, even if you often interact with your pet for training and playing, it will not hurt your palm.One package includes 1 pc long leash..
Nylon Training Dog Leash for Small Medium Large Dogs, 15ft 20ft 30ft 50ft Long Leash Dog/Puppy Lead for Obedience Recall Training, Camping (20ft, Black)
Dog Leash Dimensions training leash measures 34 inch width by 15 feet length, offering you dog for more wandering area and freedom.. Nylon Long leash long lead is made of strong wear-resistant nylon, available in Black, Blue, Red and Green color.. Dog training leashes suitable for teaching your dogpuppy recall and other obedience skills, great for small, medium, large dogs.. Easy on and Easy off Swivel-style bolt snap resists twisting. 360 degree tangle free swivel heavy duty clasp gives your dog best freedom.. The dog training leash is built to last. If you have any question, please contact us, we will solve the problem until you are satisfied..
Vivifying Dog Training Leash, 32FT Durable Nylon Long Lead with Drawstring Bag for Training Small, Medium and Large Dogs (Orange+Black)
LONG LEASH SIZE - Long dog leash is built with high quality nylon, measures 1inch wide by 32 feet long. Great for recall training, hiking, hunting, backyard, beach, outdoor play toy ball. SOFT PADDED HANDLE - The handle of tracking training leash covered with a high density foam which is for amazing comfortable shock grip, protects your hand from nylon leash burn, and will afford you and your dog more pleasure. EASY WEAR AND REMOVE - Long leash for dog training is made from strong metal hook, trigger for easy attachment to your dog's harness or collar, rotated by 360degree allows your pets to play more secure. PERFECT DESIGN - We added a fasten tape design and provided a drawstring bag, its more convenient for strapping and storage after using. This long line lead is lightweight and smooth so that its easy to clean. WIDELY USE - Extra long recall training leash is suitable for small medium large dogs, like Samo,Teddy, Husky, Rottweiler, Alaska, Chihuahua, Schnauzer, Miniature Pinscher, Golden Retriever, German Shepherd, Tibetan mastiff and other pets.
BTINESFUL Tie-Out Check Cord Long Rope Dog Leash, 8ft 12ft 20ft 30ft 50ft Recall Training Lead Leash- Great for Large Medium Small Dogs Training, Playing, Camping, or Backyard (20ft, Blue Black)
This long dog leash is 25 inch 1.0cm in diam rope leash, by 8ft, 12ft, 20ft, 30ft and 50ft five length for different dog training purpose, give your small medium and large dogs a plenty of line to roam without getting too far away.. The long training lead tie out for dog, made of rock climbers rope. It's strong but lightweight. Great for hiking, camping, training, hunting, backyard, beach, recall training, outdoor play with tennis balls, and swimming. 360 degree rotation zinc alloy hook tangle free design, strong and rust-proof, on both ends can be easily attached to a post or stake. A unique tie-out dog training lead.. The long line dog leash has bright colors. Give an easy visual detection on any background the Bush, grass or in the woods. You can easily find your dog in the distance.. This high quality nylon rope is sturdy and long enough for a separate use. It works great as a dog leash to tie out to a tree or railing used as a clothesline it also works as a bundling rope, luggage strap, etc.
XiaZ 50 ft Dog Tie Out Run Trolley Cable, Pet Heavy Duty Reflective Dog Leash Lead Runner for Large Dogs Up to 250 Pound
ULTRA STRONG XiaZ dog leash wire cable is made of 5mm diameter high quality stainless steel wire rope, the pull is up to 5 KN by professional tensile test,ultra strong and durable for dogs up to 250 lbs, giving more space to move around freely while keeping him safe.. 304 STAINLESS STEEL HEAVY DUTY BUCKLE Tie out for large dogs use 304 stainless steel clasp, totally rust proof, more durable and stronger than others, One end is connected to a post, and the other end is connected to the dog, which can provide the dog with free movement in your backyard.. ANTI-RUST AND REFLECTIVE The Vinyl covered dog leads for yard and all hardware are made to protect against rain and rust. Reflective cable coating reflects light at night or in low light, providing additional safety for dogs.. DUAL FIXED UPGRADE CLASP The heavy duty 50ft dog lead upgrade the clasp and dual fixed and vinyl covered, so the clamp cant't take apart and dog can't run away from the tie out trolley system cable.. 50 FEET SIZE AND LIGHTWEIGHT The length for dog runner for yard is 50ft long, you can use dog cable to keep them safe in camping, park, yard, Garden and other outdoor activities. Its only 2 lb, also easy to carry. Warm tips Please do not let your dog be tied alone for a long time, check your dog safe in time..